North Shore Waste Water Treatment Plant
We provided 2MVA construction electrical power connection design with 15kV load break recloser, oil filled transformer, 480V downstream power distribution inside an outdoor unit substation and an application package to BCHydro for a new ~200,000 sq. ft. waste water treatment facility in North Vancouver, BC.